FREQUENTLY ASKED QUESTION
- 01
Rohannah Solar Energy is a mechanical-only contractor delivering the complete mechanical construction of utility-scale solar farms. Our scope includes:
Piling (where required)
Torque tube installation
Racking & structural frame assembly (fixed-tilt and tracker)
PV module installation
Structural alignment & tolerances
Torqueing (module + structure)
Full mechanical QA/QC
Workforce mobilisation and on-site supervision
We focus solely on mechanical delivery so EPCs achieve higher installation rates, fewer delays, and better QA compliance.
- 02
No. We do not perform electrical works. By remaining mechanical-only, we deliver:
Faster deployment
Cleaner sequencing for EPC planning
Higher mechanical productivity
Fewer interface conflicts on site
We integrate seamlessly with the EPC’s preferred electrical partner.
- 03
We operate across major solar development markets: • United States • United Kingdom • Caribbean (Jamaica hub) • Europe
Our international workforce partnerships allow large-scale deployment across multiple regions simultaneously.
- 04
We field a large, disciplined workforce consisting of:
150+ trained mechanical installers
23 senior fitters/supervisors
Scalability to 250+ operatives for multi-site or accelerated delivery
Our labour capacity is engineered for 100–300 MW utility-scale projects.
- 05
We support:
Mid-scale projects (10–50 MW)
Large utility-scale projects (50–150 MW)
Mega-scale projects (150–300+ MW)
We are structured for both single-site and multi-site national programmes.
- 06
Yes. Our teams have extensive experience with:
Fixed-tilt ground mount
Single-axis tracker systems (all major OEMs)
Mixed-terrain hybrid installs
All installations follow OEM tolerances and EPC engineering specifications.
- 07
We specialise in fast mobilisation:
7–10 days for urgent deployment
2–3 weeks for standard mobilisation
Large workforce reinforcement every 7–14 days
This is ideal for EPCs facing schedule pressure or delayed starts.
- 08
Yes. Every project includes:
Senior fitters
Supervisors
Section leads
QA/QC operatives
HS (where required)
This structure ensures productivity, safety, and disciplined execution.
- 09
We comply with all major regional safety systems:
OSHA (United States)
CDM 2015 (United Kingdom)
ISO-aligned internal safety systems
Mandatory RAMS, toolbox talks, lift plans
Senior safety oversight
Our safety culture aligns with EPC-level expectations.
- 10
We provide complete mechanical QA/QC packages including:
Torque logs (structure + modules)
Tolerance & alignment verification
Daily progress reports
Photographic evidence
Mechanical Completion Certificate (MCC)
As-built documentation
Our QA/QC documentation supports full EPC and utility handover.
- 11
Absolutely. We routinely integrate into EPC structures and program schedules. We can operate:
As a dedicated mechanical subcontractor
As the lead contractor for the mechanical package
Within EPC reporting systems and QA frameworks
We adapt to EPC methodology quickly and operate with minimal oversight.
- 12
Mechanical-only specialist (higher productivity, fewer delays)
Large international workforce
Proven delivery of 240–250 MW annually
Capability for tracker + fixed-tilt systems
Strong QA/QC discipline and documentation
Rapid mobilisation and multi-region capacity
Competitive pricing across US, UK, EU, Caribbean markets
We deliver speed, consistency, and international-standard quality.
- 13
We offer flexible pricing based on:
MW volume
Terrain & site complexity
Region
Workforce size
System type (tracker/fixed-tilt)
Duration & schedule
Mobilisation requirements
We provide initial pricing within 24–48 hours.
- 14
Yes. We can run multiple sites in parallel across different regions. Our labour structure supports:
Multi-site EPC programmes
Staggered project schedules
Large geographic coverage
This is ideal for clients delivering national or regional solar portfolios.
- 15
Email:info@rohannahsolarenergy.co.uk
Phone:+44 7539 489148
We can arrange calls, scope reviews, workforce modelling, and MW-based estimates.